MBU 507 Project Scheduling and Cost Control

Teaches the attributes and methods of both project scheduling and project cost control. The critical elements of project planning, management, and control functions will be studied and applied in an integrated approach. An emphasis will be placed on the deconstruction of the project elements and development of the project Work Breakdown Structure (WBS). This includes the role of the WBS in project cost estimating, cost control and project scheduling.

Credits

3

Prerequisite

MBU 505